A test plan can be defined as a document for a software project that defines the approach, scope, and intensity of the effort of software testing. |
The test strategy is a set of instructions or protocols that explain the test design and determine how the test should be performed. |
A test plan can be changed. |
While the test strategy can’t be changed. |
The test plan happens independently. |
While test strategy is often found as a part of a test plan. |
The test plan describes the details. |
While test strategy describes the general methodologies. |
A test plan is done by the test administrator or test manager. |
While The project manager does it. |
A test plan is utilized at the project level. |
While the test strategy is utilized at the association level. |
A test plan has the essential objective of how to test when to test, and who will confirm it. |
While test strategy has the essential objectives of what approach to pursue and which module to check. |
Based on the testing strategies. |
Based upon pre-defined standards. |
Different types of test plans are level-specific, type-specific, and master test plans. |
Different types of test strategies are model-based, analytical, methodical, reactive, standard-compliant, consultative, and regression-averse strategy. |
Only a single project is affected at a time. |
Multiple projects can be impacted at a time. |
It describes the general and common specifications in the testing of a specific object. |
It describes the approaches in testing. |
Contact Us