Prerequisites For Mainframe Testing

Below are some of the prerequisites of mainframe testing:

  • A login ID and password are required to access the application.
  • A basic understanding of ISPF commands.
  • The file names, file qualifiers, and kinds are all listed.

The following points should be checked before beginning mainframe testing.

1. Job:

  • Before performing a job, do a job scan (Command – JOBSCAN) to check for problems.
  • The test class should be specified in the CLASS parameter.
  • By utilizing the MSGCLASS argument, one can direct the task output to a spool, a JHS, or wherever else one wants.
  • Redirect the job’s email to a spool or a test mail ID.
  • For initial testing, comment out the FTP steps and point the job to a test server.
  • If the job generates an IMR (Incident Management Record), just comment “TESTING PURPOSE” on the job or param card.
  • All of the job’s production libraries should be switched to test libraries.
  • It is not a good idea to leave the job unattended.
  • TIME parameter should be added with a specified time to avoid the job from running in an infinite loop if there is an error.
  • Save the job’s output, which includes the spool. XDC can be used to save the spool.

2. File:

  • Only make a test file of the required size. When storing data into successive files with the same name, use GDGs (Generation Data Groups – Files with the same name but sequential version numbers– MYLIB.LIB.TEST.G0001V00, MYLIB.LIB.TEST.G0002V00, and so on).
  • The files’ DISP (Disposition – defines the procedure for keeping or deleting the dataset following a normal or abnormal step or task termination) parameter should be coded correctly.
  • To avoid the job going into HOLD, make sure all of the files utilized for job execution are saved and closed appropriately.
  • If you’re using GDGs to test, make sure you’re pointing at the correct version.

3. Database:

  • Ensure that no undesired data is inserted, changed, or deleted while running the job or online program.
  • Also, make sure you’re testing in the correct DB2 region.

4. Test Case:

  • Always check for boundary conditions such as an empty file, the first record being processed, the last record being processed, and so on.
  • Include both positive and negative test conditions whenever possible.
  • Include test cases to validate if the modules have been utilized correctly if standard procedures are used in the software, such as Checkpoint restart, Abend Modules, Control files, and so on.

5. Test Data:

  • Before you start testing, make sure the test data is ready.
  • Never make changes to the test region’s data without first informing the user. Other teams may be working with the same data, and their tests may fail.
  • Before copying or accessing the production files, sufficient authorization should be obtained.

Software Testing – Mainframe Testing

Mainframe testing is used to evaluate software, applications, and services built on Mainframe Systems. The major goal of mainframe testing is to ensure the application or service’s dependability, performance, and excellence through verification and validation methodologies, and to determine if it is ready to launch or not. Because CICS screens are custom-built for specific applications, the tester just has to know how to navigate them when performing Mainframe testing. Also, if the code in COBOL, JCL, or other languages is changed, the tester does not have to worry about the emulator being set up on the system.

Here, we will discuss the following points:

  1. What is Mainframe?
  2. Mainframe Testing Methodologies.
  3. Prerequisites for Mainframe Testing.
  4. Mainframe Attributes.
  5. Steps for Mainframe Testing.
  6. Mainframe Testing Procedures To Follow.
  7. Types of Mainframe Manual Testing. 
  8. Mainframe Automation Testing Tools.
  9. Best Practices For Mainframe Testing.
  10. Mainframe Testing Challenges and Troubleshooting.
  11. Benefits of Mainframe Testing.

Similar Reads

What is a Mainframe?

The mainframe is a high-performance, high-speed multi-user computer system. The mainframe machine system is the most secure, scalable, and reliable machine system available. In other words, these systems are utilized for larger-scale computing, which requires a high level of availability and security. Mainframe systems are commonly employed in industries such as retail, insurance, finance, and other essential areas where large amounts of data must be processed several times. One can perform millions of instructions per second [up to 569,632 MIPS] with the help of the following factors:...

Mainframe Testing Methodologies

Some of the most commonly used Mainframe testing commands are as follows:...

Prerequisites For Mainframe Testing

Below are some of the prerequisites of mainframe testing:...

Mainframe Attributes

The following are the various mainframe attributes:...

Steps for Mainframe Testing

Mainframe testing can be done in two ways- manually or with the help of automation tools like QTP, REXX, and IBM application performance analyzer. The following are the steps for mainframe testing:...

Mainframe Testing Procedures to Follow

When undertaking mainframe testing, keep the following steps in mind:...

Types of Mainframe Manual Testing

Mainframe Manual Testing is divided into two parts:...

Mainframe Automation Testing Tools

The following are some of the mainframe automation testing tools:...

Best Practices For Mainframe Testing

Dry run of job: Doing a dry run of the job under test is always a smart idea. Empty input files are used for the dry run. This procedure should be undertaken for any jobs that are affected by the test cycle changes. Complete test task setup: The test task setup should be completed well in advance of the start of the test cycle. This will aid in the early detection of any JCL errors, saving time during execution. Set auto-commit to NO: Always set auto-commit to “NO” when accessing DB2 tables through SPUFI (the emulator’s option for accessing DB2 tables) to avoid unintentional updates. Confirm technical inventory: Don’t underestimate the importance of effective project management and solution architect support for your project. Typically, these projects focus on applications that have been critical to the business for a long time. Confirming technical inventory and obtaining test and use case data are the two greatest time and expense drivers for mainframe migration initiatives. Make sure that your expertise is available and invested in the project. Create required data in advance: It is considered best practice to create test data in advance of the test cycle and should be checked for completeness of the data....

Mainframe Testing Challenges and Troubleshooting

Every type of testing is a succession of trials and errors until you find the best system possible. Testing on mainframes is no different. Throughout the process, the testing team will be confronted with problems or troubleshooting. Some concerns that have been often reported by testers are discussed below, as well as a suggested approach that might be used to discover a solution....

Benefits of Mainframe Testing

The following are some of the benefits of successfully completing the mainframe testing:...

Contact Us